Central Systems � CBH Silo Upgrade

Contracted for the supply of scaffolding and labour for the refurbishment of the old concrete silos in Albany WA. Contract involves 10 silos� each with an engineered 30m high scaffold. Each has 15 working decks. Also included is the removal and replacement of a free standing, 30m Alimak Personnel hoist (all staff have completed specialised training to complete this task ).

Scaffolding for CBH upgrade
Scaffolding for CBH upgrade

FQM Nickel Mine (Ravensthorpe)

Contracted for the supply of scaffolding and labour for shut down works on the mine and also the refurbishment of the old acid tanks in Ravensthorpe WA. Contract involves periodic shut downs which run for approx. 2 weeks, scaffolds include everything from basic access towers, ramps and work platforms, to large cantilevered and hanging scaffolds for tank and conveyor repairs. The new acid tanks require a full scaffold wrap on each piece, not dissimilar to works we are currently contracted on for Central Systems at the Albany Port.

Scaffolding for Ravensthorpe Acid Tank rebuild
Scaffolding for Ravensthorpe Acid Tank rebuild

Nab Challenge Match - Souness Park (Mt Barker) Grandstands for 1800 people

Approached by the Shire of Plantagenet and the AFL, extra seating was required to fit a possible 6000 supporters into Souness Park to view the AFL match between The Fremantle Homos (Dockers) Vs Adelaide Crows.
105m section of the oval was dedicated to fit as much seating as possible to help accommodate as many of the 6000 as possible. We were able to build 5 x 4 tiered Grandstands which seated 1800 people, giving them all an amazing view of the game.
We also donated 500m of Temp Fencing & 400m of Crowd Control Barrier for the event to help keep costs down for the shire.

Grandstand seating for NAB cup football match
Grandstand seating for NAB cup football match

ALAC � Duct replacement

Contracted to supply an engineered scaffold that was able to take the weight of 2 scissor lifts and also not damage the pool, for the replacement of the old ducting system throughout the ALAC complex.
The design needed to take into account the concrete construction of the pool floor and also upwards pressure from natural water sources in the ground.
Timber boards and ply were used to spread the point-load weights the scissor lift wheels produced. Job was completed without incident and engineering design was without fault.

ALAC ducting replacement over swimming pool
ALAC ducting replacement over swimming pool

BGC � The Natural Bridge & Gap works

Contracted by BGC to install scaffold platforms and safety hand railing for the installation of the new viewing platforms in the Torndirrup Nation Park. Hand railing and fencing was used to keep visitors to the national park , safe. Platforms and hand rails where also installed to keep workers installing the new platforms safe from the massive fall into �The Gap� when they were working above. Job is still ongoing.

BGC Gap and Natural Bridge viewing platform
BCG Gap and Natural Bridge viewing platform

Centenary of ANZAC Celebrations

This was a very enjoyable project we worked on for 5 individual companies. The time frame was extremely tight and tensions were high to get everything completed on time. Scaffolds ranged from lighting, camera & speaker towers to fully encapsulated/cladded tv monitor boxes. All scaffolds were engineered for public safety and had to be approved and signed off by the Head Company. We also provided 1.2km's of temporary fencing throughout Albany and 5.2km's of crowd control barrier for the ANZAC parade on York Street.

Centenary of ANZAC Celebrations Scaffolding
Centenary of ANZAC Community Concert Stage Setup

WAVE - Vic Stock

Contracted to supply scaffold and labour for the scaffolding required at the new port Grain Terminal. Scaffolds included multi-level towers, hanging & cantilevered platforms, semi-permanent hand railing, installation of static lines & dancefloors.


Due South Tavern

Contracted for the supply of scaffolding and labour for the building of the new Tavern on Albany's foreshore � Due South. The building was wrapped in scaffold to allow trades to work safely, tube & clip walkways were built on/and over the roof structure and ladder-beam sections installed to allow access inside the building.

Due South Tavern Scaffolding

Stirling Terrace Upgrades

With the ANZAC celebrations on the horizon, Albany was in dire need of a facelift, one of the focal areas of this was the heritage listed Stirling Tce. We provided 3 x multi-level scaffolds spanning almost half length of Stirling Tce for stoneworkers, carpenters and painters to work their magic on the old buildings. Pedestrian walkways were required and access to all business' were a must as trading had to continue whilst the restoration works took place.

Stirling Terrace Upgrades
Albany Health Campus Scaffolding

John Holland � Albany Health Campus

Contracted to supply scaffold and labour for the scaffolding required at the new Albany Health Campus. Scaffolds included multi-level towers, hanging & cantilevered platforms, semi-permanent hand railing, installation of personnel & material hoists.

Albany Health Campus Scaffolding
Albany Health Campus Scaffolding

Advanced Formwork � Albany Health Campus

Specialised scaffolding projects associated with the new Albany Health Campus.

Advanced Formwork Albany Health Campus
Advanced Formwork Albany Health Campus

Jonor Constructions � Pallinup Bridge

Upgrade to the Pallinup River bridge. Multiple access towers were built and moved for the duration of the project. Located 105km North-west of Albany, the terrain under the bridge proved to be difficult, including water from the river and large boulders used for retaining & support.


Emco � UWA Expansion Albany

Supply and installation of scaffolding and associated products for the new extension to the UWA building Albany. Project ran for approx. 18 months with a number of difficult obstacles to overcome. The building site was tight, had ground-water issues and was on the side of a sand hill making the scaffold build very tricky in parts. Approx. 60 tonnes of scaffold in total with a number of spurred sections and areas requiring ladder beams or cantilevers.

UWA Expansion Scaffolding
UWA Expansion Scaffolding

Plantation Pulp Terminal (PPT) � Albany Port

Transfer station upgrade. A fully encapsulated scaffold build overtop of running conveyors was required for a full blast and paint along with major repairs to CV9 on Albany�s Port. A total of 28 Aluminium Trusses of different sizes were required to complete this project.

Plantation Pulp Terminal Scaffolding
Plantation Pulp Terminal - Albany Port

DEC - Mt Franklin Skywalk

Skywalk project at Mt Franklin, Walpole, in the Great Southern of WA. Initial scaffold was an 8m viewing platform build where the Skydeck would eventually lead. Once DEC got the go-ahead, scaffold was built to support the building of the Skydeck along with providing edge protection. The Skydeck is located 16km north of Walpole and build in a national park, getting the scaffold to where it was needed required a mountain of effort.

Mt Franklin Skywalk
Mt Franklin Skywalk

Duwals � Albany Leisure Centre Expansion

Supply and installation of scaffolding and associated products for the new extensions to the Albany Aquatic and sporting upgrade. Access towers, 5t rated tube & clip ramps to take EWP�s and scissor lifts. Along with engineered hand rail system designed by Albany Scaffold Hire.

Albany Leisure and Aquatic Centre Expansion
Albany Leisure and Aquatic Centre Expansion

Broad Constructions � Albany Prison Upgrades

Supply and installation of scaffold and associated products to the new prisoner accommodation wing at Albany Regional Prison. External scaffolding along with stair/access towers.

Albany Regional Prison Upgrades

Bert Muezullar Homes - Albany Senior High School Youth Centre Upgrade

Albany Senior High School Youth Centre Upgrade

CBH (Albany Port Terminal) � Ongoing Maintenance

Supply & install scaffold for maintenance and repairs of infrastructure. Scaffolds include multiple hangers, 35m - 45m access towers, under wharf and cantilevered hangers.

CBH Ongoing Maintenance

WACB � Ongoing Domestic housing

Commercial & domestic scaffolding as required.

West Australian Country Builders Ongoing Scaffolding requirements

Water Corporation � Ongoing maintenance in the Great Southern

Scaffolding for water treatment tanks, access towers to water storage tanks and scaffolding as required

Water Corporation ongoing projects

Various Sporting Events

Various sporting events
Various sporting events